Empanelled As ESCO With BEE
Awarded First as ESCO BY MEDA
Opel Energy Systems Private Limited Pune
  • newani
  • newani1
  • newani2
  • newani3
  • newani4
  • newani5
  • newani6
  • newani7
  • newani8
  • newani9
  • newani10
  • newani1
1 2 3 4 5 6 7 8 9 10 11 12
 
 
   
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Energy Conservation Projects :

1.
Waste heat recovery
2.
Increasing overall efficiency of the thermal equipment.
3.
Avoiding heat losses.
4.
Conversion of electrical heating in to Thremal heating.
5.
Use of low cost fuel for same application.
6.
F.O.Emulsification for reducing consumption.
7.
Use of Fuel saving Devices.
8.
Heat repellant coating for furnaces ovens.
9.
Insulating hot surfaces.
10.
Tuning of Burners for their highest combustion efficiency.
   
 
For case syudies in energy conservation
www.opelenergysystems.com
 

Waste Heat Recovery Systems on Furnace | Waste Heat Recovery Systems on DG Set Exhausts | Air- Preheaters For Thermopack | Energy Audits | Energy Conservation Projects | Waste Heat Recovery On DG Sets | Fuel saving Devices for all Fuels |
Flux Maxiox Fuel Saving Devices | Thermic Fluid Heating Systems | Waste Heat Recovery On Furnaces | Insulation projects to avoid losses | FO Emulsification Systems | Laddie Preheaters | Heat Treatment furnace | Industrial Burners | Air Source Water Heaters | Heat Pump Dryer | Heat Pumps | Home | Profile | Contact Us | Feedback |

Request A Quote
Google-Play